Sttr
Crew Member
Here’s some pics of today's work.
Lots of grinding and preparing the deck.
Sealed up the thru hulls on the bottom of the hull with first 2 layers mat, then 1 24oz roving, 2 mat, 1 roving, 1 mat, and top knytex.
Prepped the deck again and started to lay 2 mats before the ply. As much as I want to take all the stringers out now, I don’t want to lose any more structural stability. With the deck solid connected to the hull, it should add some extra strength that we removed to keep her in place when we are replacing the stringers.
I’m hoping to lay the deck down tomorrow…
And that’s just what up swept up from the bow area, seems like a lots to me LoL
Lots of grinding and preparing the deck.
Sealed up the thru hulls on the bottom of the hull with first 2 layers mat, then 1 24oz roving, 2 mat, 1 roving, 1 mat, and top knytex.
Prepped the deck again and started to lay 2 mats before the ply. As much as I want to take all the stringers out now, I don’t want to lose any more structural stability. With the deck solid connected to the hull, it should add some extra strength that we removed to keep her in place when we are replacing the stringers.
I’m hoping to lay the deck down tomorrow…
And that’s just what up swept up from the bow area, seems like a lots to me LoL