A-a-Ron
Well-Known Member
For those who want to follow along I will post progress along the way, hopefully it’s helpful to some people, might even intice you to do the same. Some winter season entertainment at the very least.
Week 1; Swim grid off, leg off, engine out and cleaning up the sludge mess left below. Great chance to clean/tidy up wiring, change bilge/well pumps, etc. Almost ready for getting measured up for the pod, then patch all the holes and send it off mid-Dec for pod install. Likely putting a hard top on her as well.
Week 1; Swim grid off, leg off, engine out and cleaning up the sludge mess left below. Great chance to clean/tidy up wiring, change bilge/well pumps, etc. Almost ready for getting measured up for the pod, then patch all the holes and send it off mid-Dec for pod install. Likely putting a hard top on her as well.