Double Eagle 185 Build

Case study in why it’s a good idea to run E0 fuel, a racor, and to run your fuel system dry before storage. Glad you caught that before it got worse!
 
… new tanks installed and wrapped up some interior lighting. Hull is primed and ready for a final sand prior to paint. Rigging close to wrapped up. Quick rip to the cabin to dust things off 👍. Thanks again @Brando !
 

Attachments

  • IMG_7447.jpeg
    IMG_7447.jpeg
    123.9 KB · Views: 117
  • 04267BDA-1AD6-4DFB-916F-DC7E8239C17A.jpeg
    04267BDA-1AD6-4DFB-916F-DC7E8239C17A.jpeg
    280 KB · Views: 109
  • IMG_7466.jpeg
    IMG_7466.jpeg
    357.1 KB · Views: 116
  • IMG_7438.jpeg
    IMG_7438.jpeg
    353 KB · Views: 115
Back
Top