Boat is almost done at the shop. A few delays with parts on order but should be sea trials next week!
Kicker is tied into the main, rear helm is up and running, I had 30a breaker switches wired in for the downriggers rather then relying on fuses since I've had many times where the trap puller has blown it after getting hung up. Downriggers are also mounted but will have more bolts to secure.
The blue tube in the photos is a mock up for the washdown hose (not its final position). It will be made black and attached to the pod vs going through the hull. One less hole in the boat!
Next steps after sea trials are to do some Cuddy work and cosmetic details.