Alex_c
Well-Known Member
Highlight of last year at Vanier was a dozen boats waiting to load on their trailers at low tide while some guy in a sailboat and a crew of 6 took literally 30+ minutes to push off while taking up most of the dock, and blocking half the ramp. Once he was finally ready, he spent another 10 minutes getting his motor running, then another 5 letting it warm up. I’ve got a pretty long fuse, but can’t say the same for everyone else. This was when only 1 ramp was open, and I think the rowing club was taking up the other half of the ramp.