sudsy
Well-Known Member
Back in june I reached out to Doug at northwest to see about getting a hull built.  After going back and forth and seeing a similar boat that he was working on at that time my wife and i agreed that this was going to be our next boat. 
I sold my defiance boat in September after it being on the market for just over a month. Ironically the day I sold my boat...as I was pulling onto the highway leaving campbell river and heading south to victoria I got the email from Doug saying he had material and was starting my boat the following week (Sept 13). 4 weeks later I was taking delivery (26 Oct).
I had made arrangements with Doug that he would do all of the metal work and I would finish the boat from that point.
Here's a couple photos from week 1 - the beginning...
	
		
			
		
		
	
				
			I sold my defiance boat in September after it being on the market for just over a month. Ironically the day I sold my boat...as I was pulling onto the highway leaving campbell river and heading south to victoria I got the email from Doug saying he had material and was starting my boat the following week (Sept 13). 4 weeks later I was taking delivery (26 Oct).
I had made arrangements with Doug that he would do all of the metal work and I would finish the boat from that point.
Here's a couple photos from week 1 - the beginning...
 
				 
						 
 
		 
			 
			
 
 
		 
 
		



 
			 
			 
			 
			 
			 
 
		 
 
		 
 
		 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
			 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		 
 
		