Seasport 22 inboard to out board

It is like Santa came early
Not unlike in the construction business, when it's always a happy day for clients when we make a big pile of empty flattened cardboard. Means we did a bunch of FINISHED work, be it flooring, plumbing fixtures, appliances, tiles, door hardware, shelving, whatever.
 
Ordering control cables tomorrow, just want to ensure I am measuring right
Used this method. Everyone putting the loop before going to the engine rigging tube?
Rare to see the loop out in the open but I think most people allow the extra cable length.
 
Back
Top