SpringVelocity
Crew Member
Well its done finally did it. My inboard gets pulled next few weeks. Motors are secured.
New Suzuki 150 and 9.9 efi for power. Ripping out steering and moving to hydraulic steering with second helm.
Photos to come....
I am really trying to get some ideas for the floor hatch etc. Over doghouse floor. Anyone that podded one able to post some pics?
Any ideas are helpful. My thoughts are to just cnc cut a piece of aluminum out etc. I am trying to figure out what I uses space for.
Currently boat has no fish locker space which has alway been a pain.. So it is either cooler off pod or in there.
New Suzuki 150 and 9.9 efi for power. Ripping out steering and moving to hydraulic steering with second helm.
Photos to come....
I am really trying to get some ideas for the floor hatch etc. Over doghouse floor. Anyone that podded one able to post some pics?
Any ideas are helpful. My thoughts are to just cnc cut a piece of aluminum out etc. I am trying to figure out what I uses space for.
Currently boat has no fish locker space which has alway been a pain.. So it is either cooler off pod or in there.
Last edited: