I promised ...

Foxsea

Well-Known Member
Pictures!
The boat is out of the shed and getting splashed in 3 hours. Brando welded up a fine pedestal for my newly installed Halo 20+ radar. Thank you!
I painted it with white epoxy paint and then 2 coats of Krylon for outdoor UV protection.

20220424_084828.jpg

And then my seemingly never-ending project of a tunnel thruster installation. I've worked on time-consuming projects over a life-time but this one - wow! I thought the tunnel was the big job but no, it was all the wiring!
20220424_084853.jpg
 

Attachments

  • 20220424_084828.jpg
    20220424_084828.jpg
    169.2 KB · Views: 46
Back
Top