First time poster so thanks in advance.
I'm working on a 1980s 17'6 Double Eagle Hardtop outboard project with my girlfriend as a quarantine project.
Here's what we've done so far:
Calum
I'm working on a 1980s 17'6 Double Eagle Hardtop outboard project with my girlfriend as a quarantine project.
Here's what we've done so far:
- Removed all electronics, motors, accessories, cleats, ect
- Removed floor to inspect stringers and transom - looks like someone did the stringers, floor and transom not toooo long ago. All fine. There is also a huge fuel tank forward on the boat that I'm assuming is not stock.
- 5 or 6 days of fiberglass work filling holes and imperfections
- A few days of sanding and prep work
- Applied interlux primer
- Sanded and prepped for Interlux brightside topcoat paint
- Bought a Mec 115 2-stroke
- Bought a yamaha XL leg kicker
- Prepped new electronics - gps, fishfinder, bluesea add a battery system, pumps, switches, speakers, etc
- We've been debating the seating set up for weeks. We removed and got rid of the old sleeper seats. Thinking about doing two forward seats with two bench seats behind similar to a 16-21 kingfisher. Any ideas or recommendations... or better yet, pics of your set up?
- Where should I mount the downriggers and rod holders? The gunnel isn't very well suited to mounting a downrigger and I'm considering fiberglassing a nice level square area for the downrigger to mount. Anyone have photos of their set up?
Calum